Choose the right engine head: Choose the right engine head according to your needs and budget. Consider the models and specifications compatible with the original engine head of Wuyang Honda Tongyu 125. Prepare tools and materials: Prepare the required tools and materials, such as wrenches, screwdrivers, washers, sealants, etc.
Steps to remove from the engine rack: (1) Empty the water and oil in the tank, turn off the fuel tank switch, and remove the oil pump pipe connector. ( 2) Remove the power cord and the wire on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connect bolts and pins, etc. Remove the water tank and frame.
General special tooling: magnetic motor stop-rotation and rotor disassembly tooling, clutch stop-rotation, crankshaft stop-rotation, sprocket stop-rotation, plastic hammer, special four-claw sleeve, valve installation tool, lengthened iron hook (for loading the current chain), plug ruler (valge adjustment valve gap).
1 Use the main support frame to support the car on the flat ground. 2 Turn the main switch to the "OFF" position. 3 Remove the outer cover of the car. 4 Dray the engine oil. 5 Remove the negative wire of the battery first, and then remove the positive wire. 6 Remove the carburetor and automatically start the thickening valve wire.
The specific steps for motorcycle engine disassembly are to remove the carburetor first. When disassembling the carburetor, you need to unplug the plugs of each hose and wire first. Then you need to remove the spark plug cap of the motorcycle, remove the exhaust pipe, and then remove the air filter.
Remove the bearing cover.Unplug the opening pin of the bearing. Remove the screw limit card cover of the bearing. Unscrew the screw that fixes the bearing. Remove the flange and bearing. Install a new bearing. After covering the flange, screw on the fixing screw. Install the card pin.
First, remove the centrifugal machine filter, then pull out the clutch putter and the separation bearing, and finally remove the spring with the spring clamp. The clutch can be removed as a whole.
The principle is also different depending on the engine. I'll just say it briefly. There are two shafts in the engine: the main shaft and the auxiliary shaft, also known as the active shaft and the drive shaft.
The method of replacing the auxiliary axle of a tricycle is as follows: align the main and auxiliary gear shafts and load them into the left box of the engine, and then load the variable speed drum and fork. Put the fork head of the fork into the main and auxiliary shaft gear grooves. Pay attention to the left, middle and right signs on the fork. Don't install them wrongly.
How to connect the three-wheeled motorcycle engine and the transmission shaft? Cylindrical gear transmission. For the upper camshaft and the lower camshaft, the gas valve mechanism mostly uses cylindrical timing gear transmission, and the crankshaft gears mesh with the camshaft gear through the intermediate gear. The timing gear uses more helical teeth to ensure smooth meshing and reduce noise.
In this case, if the telescopic spline stroke of the transmission shaft is not enough, the reverse gear must be removed, and the reverse gear is not difficult to remove five screws.
1. If you want to remove the four long screws of the Honda CG125 fixed cylinder head and cylinder block, you can find two M8 nuts and put themScrew it to the thread above the screw, then tighten the two screws together, and then tighten the nut below in the direction of unloading, so that the screw can be removed from the engine box.
2. The whole process of the automobile engine assembly line is as follows: the bottom of the cylinder block is facing down, the cylinder block, crankshaft, camshaft feeding, cleaning, blowing, diesel engine model, marking printing. After the cylinder block is flipped 180°, type the number to confirm. After the cylinder is turned over, the bottom of the cylinder is facing up.
3. The steps to reassemble the four-stroke gas distribution mechanism are as follows. 1 All parts must be cleaned before assembly, and all oil channels and oil holes must be blown with compressed air (cylinder). 2 Apply lubricating oil to all relatively moving parts to avoid dry friction during the initial operation of the engine.
4. The installation process is as follows: clean the piston ring groove before installation.Turn the side marked with the English alphabet towards the piston head. When installing the piston ring, the notch should not be on the same line, and the opening should be staggered at least 120 degrees. Turn the end printed with IN on the piston towards the air intake, and the arrow marked towards the exhaust port.
Trade data for consumer electronics-APP, download it now, new users will receive a novice gift pack.
Choose the right engine head: Choose the right engine head according to your needs and budget. Consider the models and specifications compatible with the original engine head of Wuyang Honda Tongyu 125. Prepare tools and materials: Prepare the required tools and materials, such as wrenches, screwdrivers, washers, sealants, etc.
Steps to remove from the engine rack: (1) Empty the water and oil in the tank, turn off the fuel tank switch, and remove the oil pump pipe connector. ( 2) Remove the power cord and the wire on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connect bolts and pins, etc. Remove the water tank and frame.
General special tooling: magnetic motor stop-rotation and rotor disassembly tooling, clutch stop-rotation, crankshaft stop-rotation, sprocket stop-rotation, plastic hammer, special four-claw sleeve, valve installation tool, lengthened iron hook (for loading the current chain), plug ruler (valge adjustment valve gap).
1 Use the main support frame to support the car on the flat ground. 2 Turn the main switch to the "OFF" position. 3 Remove the outer cover of the car. 4 Dray the engine oil. 5 Remove the negative wire of the battery first, and then remove the positive wire. 6 Remove the carburetor and automatically start the thickening valve wire.
The specific steps for motorcycle engine disassembly are to remove the carburetor first. When disassembling the carburetor, you need to unplug the plugs of each hose and wire first. Then you need to remove the spark plug cap of the motorcycle, remove the exhaust pipe, and then remove the air filter.
Remove the bearing cover.Unplug the opening pin of the bearing. Remove the screw limit card cover of the bearing. Unscrew the screw that fixes the bearing. Remove the flange and bearing. Install a new bearing. After covering the flange, screw on the fixing screw. Install the card pin.
First, remove the centrifugal machine filter, then pull out the clutch putter and the separation bearing, and finally remove the spring with the spring clamp. The clutch can be removed as a whole.
The principle is also different depending on the engine. I'll just say it briefly. There are two shafts in the engine: the main shaft and the auxiliary shaft, also known as the active shaft and the drive shaft.
The method of replacing the auxiliary axle of a tricycle is as follows: align the main and auxiliary gear shafts and load them into the left box of the engine, and then load the variable speed drum and fork. Put the fork head of the fork into the main and auxiliary shaft gear grooves. Pay attention to the left, middle and right signs on the fork. Don't install them wrongly.
How to connect the three-wheeled motorcycle engine and the transmission shaft? Cylindrical gear transmission. For the upper camshaft and the lower camshaft, the gas valve mechanism mostly uses cylindrical timing gear transmission, and the crankshaft gears mesh with the camshaft gear through the intermediate gear. The timing gear uses more helical teeth to ensure smooth meshing and reduce noise.
In this case, if the telescopic spline stroke of the transmission shaft is not enough, the reverse gear must be removed, and the reverse gear is not difficult to remove five screws.
1. If you want to remove the four long screws of the Honda CG125 fixed cylinder head and cylinder block, you can find two M8 nuts and put themScrew it to the thread above the screw, then tighten the two screws together, and then tighten the nut below in the direction of unloading, so that the screw can be removed from the engine box.
2. The whole process of the automobile engine assembly line is as follows: the bottom of the cylinder block is facing down, the cylinder block, crankshaft, camshaft feeding, cleaning, blowing, diesel engine model, marking printing. After the cylinder block is flipped 180°, type the number to confirm. After the cylinder is turned over, the bottom of the cylinder is facing up.
3. The steps to reassemble the four-stroke gas distribution mechanism are as follows. 1 All parts must be cleaned before assembly, and all oil channels and oil holes must be blown with compressed air (cylinder). 2 Apply lubricating oil to all relatively moving parts to avoid dry friction during the initial operation of the engine.
4. The installation process is as follows: clean the piston ring groove before installation.Turn the side marked with the English alphabet towards the piston head. When installing the piston ring, the notch should not be on the same line, and the opening should be staggered at least 120 degrees. Turn the end printed with IN on the piston towards the air intake, and the arrow marked towards the exhaust port.
Global trade freight forwarder data
author: 2024-12-23 21:50HS code-based broker fee negotiations
author: 2024-12-23 20:59Surgical instruments HS code classification
author: 2024-12-23 20:09Predictive analytics for trade flows
author: 2024-12-23 19:58Fish and seafood HS code mapping
author: 2024-12-23 19:52HS code-driven customs risk scoring
author: 2024-12-23 21:28Trade data-driven inventory optimization
author: 2024-12-23 20:59How to comply with origin rules
author: 2024-12-23 20:55HS code mapping for ASEAN countries
author: 2024-12-23 20:28278.62MB
Check126.71MB
Check929.82MB
Check713.59MB
Check614.53MB
Check776.73MB
Check557.62MB
Check956.78MB
Check864.93MB
Check595.78MB
Check546.54MB
Check448.25MB
Check319.64MB
Check123.52MB
Check857.81MB
Check318.38MB
Check817.98MB
Check667.98MB
Check631.65MB
Check249.64MB
Check682.42MB
Check389.95MB
Check859.88MB
Check944.86MB
Check857.61MB
Check976.67MB
Check185.79MB
Check633.18MB
Check396.57MB
Check912.41MB
Check851.85MB
Check185.23MB
Check297.93MB
Check688.66MB
Check222.33MB
Check542.76MB
CheckScan to install
Trade data for consumer electronics to discover more
Netizen comments More
1358 HS code compliance in the USA
2024-12-23 22:17 recommend
1093 HS code-driven differentiation strategies
2024-12-23 21:19 recommend
433 How to align trade data with ESG goals
2024-12-23 21:18 recommend
699 Textile supply chain HS code mapping
2024-12-23 20:47 recommend
1653 HS code-based competitor benchmarking
2024-12-23 20:03 recommend